Kautz Road Substation Construcion, Uip Subproject 2- Krs
Solicitation from Dept of Energy (Fermilab - Doe Contractor). Responses due (37 days left).
- Set-aside
- No set-aside stated
- NAICS
- 237130: Power and Communication Line and Related Structures Construction (2022 NAICS, US Census Bureau)
- Product or service code
- Z2MZ
- Solicitation number
- RFP-383167-CD
- Place of performance
- Batavia, Illinois
- Posted
Due in 37 days (18 Dec). Get a reminder before the deadline and new power line construction contracts by email. Free.
For this notice we email you 3 days before the response date and again the day before; the power line construction list comes every week. No account, no card. One click unsubscribes. We never sell SAM.gov registration and never ask for payment to bid.
Official notice on SAM.gov (respond there, opens in a new tab) · All open power line construction contracts
Send to a partner: Copy link · Email it
Summary from the notice
This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and...
The opening of the notice's own description, cut at about 1,200 characters. The full text, attachments, amendments and contacts are on SAM.gov.
Similar open power line construction notices
- Kautz Road Substation Construcion, Uip Subproject 2- Krs
- Electrical Substation Maintenance and Repairs
- Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC
- USFK C4I Communication Tower and Facility Maintenance CY27
- 504-21-703 Training and Admin Support Space Construction
All open power line construction contracts
Independent; not affiliated with SAM.gov or the US government. Respond only through the official notice on SAM.gov.
Get new power line construction contracts by email
We send the open list now and new ones every week. Free.
No account, no card. One click unsubscribes. We only email contract alerts. We never sell SAM.gov registration and never ask for payment to bid.
Source: SAM.gov Contract Opportunities public data extract (US General Services Administration). Bid Watch US is independent; not affiliated with SAM.gov or the US government. Read .