Bikoosh: building plans in Israel › Tel Aviv-Yafoעברית

What is planned on Simha Holtsberg, Tel Aviv-Yafo? Building plans near the street

As of 28 November 2026, within about 100 m of Simha Holtsberg in Tel Aviv-Yafo there are 10 plans in the Israel Planning Administration's online plans: 1 deposited for objections, 5 under review, 0 awaiting approval, and 4 approved since 2020.

The free check lists the plans on the building and within 300 m, with each plan's stage. The result opens with a summary in English; plan details are in Hebrew.

Deposited for objections (1)

PlanOfficial name (Hebrew)Housing unitsDistance
507-1287440תא/מק/5153 אייזיק חריף-שמחה הולצברגnot statedabout 23 m

Under review (5)

PlanOfficial name (Hebrew)Housing unitsDistance
502-0921064בי/555, בור הסידnot statedon the street
502-0354647בי/1/506/מק, הרחבת מסחר ומלונאות ברחוב בן גוריוןnot statedabout 30 m
507-1159771תא/מק/4781, "פרדס דכה"not statedabout 77 m
תמל/2066/77-78תמל/2066/סעיף-77-78not statedabout 98 m
502-1121797בת ים, מבואה צפוניתnot statedabout 98 m

Awaiting approval (0)

None near this street in the online record.

Approved (4)

PlanOfficial name (Hebrew)Housing unitsDistance
502-0805655
approved 5 June 2023
בי/1/514/מק, איחוד וחלוקה, שער העיר הצפוני, בת יםnot statedabout 5 m
502-0804310
approved 1 June 2023
בי/1/550/מק, איחוד וחלוקה מתחם ביל"ו, בת יםnot statedabout 6 m
507-0931964
approved 8 October 2024
תא/4814, שמחה הולצברג, יפו ג'440about 10 m
502-0950089
approved 14 February 2022
בי/871/מק אולם ספורט גורדון ומרכז חדשנות, שינוי קווי בנייןnot statedabout 14 m

Wide-area plans covering the street

District, national or city-wide plans (for example a city-wide earthquake strengthening plan). Listed apart, not counted above.

Declared urban renewal complexes on the street

What the stages mean

Deposited for objections
The plan is published and open to objections for the period the law sets.
Under review
The plan was filed and is being reviewed, has conditions to meet before deposit, or its objections are being decided.
Awaiting approval
The plan was approved with conditions and awaits publication of its approval.
Approved
The plan's approval was published; it is in force.

The full review for one address

149 ILS (about 40 USD / 37 EUR), one payment. You buy it on the result page of your address.

Free alert for Simha Holtsberg

Get an email when a new plan is filed, or a plan is deposited for objections, within about 100 m of the street.

Free, up to 3 alerts per email address. We send a confirmation link first; every email has a one-click unsubscribe link. We check once a day. What we keep

FAQ

What is planned on Simha Holtsberg, Tel Aviv-Yafo?

As of 28 November 2026, within about 100 m of Simha Holtsberg in Tel Aviv-Yafo there are 10 plans in the Israel Planning Administration's online plans: 1 deposited for objections, 5 under review, 0 awaiting approval, and 4 approved since 2020.

How do I check a building on this street?

Type the house number on Simha Holtsberg in the field on this page. The free check lists the plans on the building and within 300 m, with each plan's stage. The result opens with a summary in English.

Are the plan names translated?

No. Plan names are shown in Hebrew exactly as in the official record; each links to its plan page.

Is this an official site?

No. Bikoosh is not an official source and gives no legal advice. The official information, documents and dates are on mavat (mavat.iplan.gov.il).

Last checked against the Planning Administration's data on 28 November 2026. Sources: Israel Planning Administration (online plans, XPLAN); street lines © OpenStreetMap contributors (ODbL); the street's locality from the Survey of Israel parcel layer; declared complexes from the Ministry of Construction and Housing (data.gov.il). Plan names are in Hebrew as in the official record. Information only, not legal advice. The official record is mavat.iplan.gov.il.